Does the xml structure of SPSS 16 production jobs (*.spj) preclude
calling the same spss program twice?
For analysis reasons I call a timestamp routine (timestamp.sps) at
the start and end of a group of included programs, but SPSS 16
production seems to remove the second (ie last) timestamp call from
the production job.
If anyone can throw any light on this I'm happy to be enlightened.
cheers
Simon
Research Database Manager and Analyst
Melbourne Institute of Applied Economic and Social Research
The University of Melbourne
Melbourne VIC 3010 Australia
Tel: (03) 8344 2085 Fax: (03) 8344 2111
http://www.melbourneinstitute.com/hilda/=====================
To manage your subscription to SPSSX-L, send a message to
[hidden email] (not to SPSSX-L), with no body text except the
command. To leave the list, send the command
SIGNOFF SPSSX-L
For a list of commands to manage subscriptions, send the command
INFO REFCARD