how to change order of attributes in data view?

classic Classic list List threaded Threaded
♦
♦
3 messages Options
Reply | Threaded
Open this post in threaded view
♦
♦
|

how to change order of attributes in data view?

Art Kendall
Is there a way to change the order of the attributes in VARIABLE VIEW?

There were long questions as the VAR LABELS in VARIABLE VIEW.  I now have a
custom attribute called "Question" which is the same as the label.  There
are several original and custom attributes in between LABEl and QUESTION so
I cannot see both on the screen at the same time.

I would like to be able to edit the content of the VARIABLE VIEW.
The alternative is cutting and pasting into a word-processing program and
making a large set of syntax.


Is there a way to have the first 3 attributes in VARIABLE VIEW be NAME LABEL
QUESTION?





-----
Art Kendall
Social Research Consultants
--
Sent from: http://spssx-discussion.1045642.n5.nabble.com/

=====================
To manage your subscription to SPSSX-L, send a message to
[hidden email] (not to SPSSX-L), with no body text except the
command. To leave the list, send the command
SIGNOFF SPSSX-L
For a list of commands to manage subscriptions, send the command
INFO REFCARD
Art Kendall
Social Research Consultants
Reply | Threaded
Open this post in threaded view
♦
♦
|

Re: how to change order of attributes in data view?

Jon Peck
Just as with built-in columns in the DE Variable View, you can select a column by clicking on its header and drag it to a new position.  You can also use View > Customize Variable View and use the up/down arrows to reposition columns, which is probably easier.

On Mon, Oct 19, 2020 at 8:32 AM Art Kendall <[hidden email]> wrote:
Is there a way to change the order of the attributes in VARIABLE VIEW?

There were long questions as the VAR LABELS in VARIABLE VIEW.  I now have a
custom attribute called "Question" which is the same as the label.  There
are several original and custom attributes in between LABEl and QUESTION so
I cannot see both on the screen at the same time.

I would like to be able to edit the content of the VARIABLE VIEW.
The alternative is cutting and pasting into a word-processing program and
making a large set of syntax.


Is there a way to have the first 3 attributes in VARIABLE VIEW be NAME LABEL
QUESTION?





-----
Art Kendall
Social Research Consultants
--
Sent from: http://spssx-discussion.1045642.n5.nabble.com/

=====================
To manage your subscription to SPSSX-L, send a message to
[hidden email] (not to SPSSX-L), with no body text except the
command. To leave the list, send the command
SIGNOFF SPSSX-L
For a list of commands to manage subscriptions, send the command
INFO REFCARD


--
Jon K Peck
[hidden email]

===================== To manage your subscription to SPSSX-L, send a message to [hidden email] (not to SPSSX-L), with no body text except the command. To leave the list, send the command SIGNOFF SPSSX-L For a list of commands to manage subscriptions, send the command INFO REFCARD
Reply | Threaded
Open this post in threaded view
♦
♦
|

Re: how to change order of attributes in data view?

Art Kendall
Thanks.

It turns out the click-and- was not working for me was settings on my mouse.

However, the <view> <customize> works extremely well.



-----
Art Kendall
Social Research Consultants
--
Sent from: http://spssx-discussion.1045642.n5.nabble.com/

=====================
To manage your subscription to SPSSX-L, send a message to
[hidden email] (not to SPSSX-L), with no body text except the
command. To leave the list, send the command
SIGNOFF SPSSX-L
For a list of commands to manage subscriptions, send the command
INFO REFCARD
Art Kendall
Social Research Consultants