running production jobs in windows 7

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

running production jobs in windows 7

wsu_wright
We are switching the machines that our production jobs run from XP to
Windows 7 (64 bit).  We are running version 18.01 of PASW Statistics.
We've setup the jobs to run in the windows 7 task scheduler with the
following parameters as an example:

"C:\Program Files\SPSSInc\PASWStatistics\paswstat.exe"
e:\BIPM_pasw_jobs\bipms_housing_spj.spj -production

We have verifed that the job runs when executed from within PASW
statistics when ran as a production job.  When we run the job from
windows 7 task scheduler, we do see that PASW is started (both paswstat
& spssengine appear in the task manager as processes but then quickly
terminate).  Its as if the job parameter are not be executed.

Has anyone using Windows 7 task scheduler any advice?

Thanks in advance,

David.

=====================
To manage your subscription to SPSSX-L, send a message to
[hidden email] (not to SPSSX-L), with no body text except the
command. To leave the list, send the command
SIGNOFF SPSSX-L
For a list of commands to manage subscriptions, send the command
INFO REFCARD